United House of Prayer for All Peoples

Washington, DC- Stripped and repaired the original 2,500 square foot copper dome, which had failed prematurely due to improper preparation. We then primed and re-gilded it with 23.75KT gold leaf. We also had two new 12’ diameter fiberglass side domes fabricated, which we gilded and then installed.